We are proud to announce that CF Tech had our first three pressure vessels stamped today with the CF Tech ASME Boiler and Pressure Vessel certification! This is a task that has been sourced for some time, it's great to see our hard work, intense studies of the code and requirements pay off. The first three vessels will become part of a pilot scale extraction of a natural agricultural product by supercritical CO2. There is an extractor, separator and storage tank. The sizes and pressure varied from 1,500 psi to 4,500 psi and 1 liter to 40 liters.
Our next two vessels up for stamping later this month will be 10,000 and 15,000 psi, 500 ml. Can't wait to add these 5 vessels to our current offerings. Please contact us for a quote!
0 Comments
|
Jessica Sweeney"All Around CF Tech-er" Archives
October 2023
Categories
All
|